Surfside: recertification in November 2026
113 buildings tracked. Updated daily.
0past their cycle, nothing filed
0under enforcement
55condo reserve studies (SIRS)
40permits in the last 30 days
Of the buildings in Surfside whose cycle we can check against a filing source, 0 have recertified, 0 have a case open, and 0 are past their cycle with nothing filed. 58 more sit where no filing source exists yet.
Journalists and associations may quote these figures with a link to this page. Compiled from public records; not a compliance determination for any building.