For structural engineers and concrete restoration firms
The buildings that will need you next year.
Every weekday morning, the South Florida buildings reaching their structural recertification or milestone-inspection deadline — including those past their cycle year with nothing filed. From county and city public records.
| Building | Cycle | Status |
|---|---|---|
| 1400 block, Ocean DrCondominium · coastal · 25-year cycle | 2022 | No filing on record |
| 800 block, Collins AveCondominium · coastal · 25-year cycle | 2024 | No filing on record |
| 200 block, W 24th StApartments · coastal | 2026 | Due this year |
| 4700 block, Pine Tree DrCondominium · coastal | 2027 | 4 months out |
A building's cycle year is fixed by the year it was built — 25 years for coastal structures in Miami-Dade, 30 inland, then every ten years. Florida's milestone-inspection law applies the same rule to condominium and co-op buildings three storeys and up statewide. So the 2027 list already exists; it just is not written down yet.
What you get
Ahead of the notice
Buildings entering their cycle in the next 18 months, so you call before the letter lands.
The catch-up cohort
Older buildings due under the statute's December 2024 catch-up deadline; many still have no filing on record.
Follow-on repair work
Reports that were not approved, open code cases and Unsafe Structures hearings, and the permits pulled after a report lands.
-
35300 block, SW 180 AVE Likely overdue - cycle year 2023, not confirmed filedUnincorporated County · 2000-01-01
- Street address
- With a subscription
- Deadline and what is on file
- With a subscription
- Who to call
- With a subscription
-
35200 block, SW 177 CT Likely overdue - cycle year 2023, not confirmed filedUnincorporated County · 2000-01-01
- Street address
- With a subscription
- Deadline and what is on file
- With a subscription
- Who to call
- With a subscription
-
14800 block, NARANJA LAKES BLVD Likely overdue - cycle year 2024, not confirmed filedUnincorporated County · 2026-09-02
- Street address
- With a subscription
- Deadline and what is on file
- With a subscription
- Who to call
- With a subscription
What arrives
- Recertification deadlines forecast from year built and coastal status
- Condo milestone inspections in Broward, Palm Beach, Lee, Collier and Monroe
- Reserve-study (SIRS) deadlines, with the association and its manager
- Code cases, liens and unsafe-structure hearings
- The engineer, contractor and record link on each building
Sources: Miami-Dade County's recertification portal and parcel data, the City of Miami, Boca Raton, and the Broward, Palm Beach, Lee, Collier and Monroe property appraisers.
Recertification feed - one county
or $3,000/year — two months free
The same feed for the one county your firm works: pick it in your settings.
2 seats included.
SubscribeRecertification feed
or $5,000/year — two months free
The full deadline feed - buildings entering their 25/30-year cycle, plus the ones already past it with nothing filed.
5 seats included.
SubscribePremium territory
or $7,500/year — two months free
Everything in the recertification feed plus permits, reserve studies and code cases. Billed yearly, it holds whole counties: no other engineering firm receives their leads.
10 seats included.
SubscribePublic records, read carefully
Every lead comes from a record a government body publishes, with a link to it. Where we lack coverage we say so rather than imply an absence, and a filing can exist before its source publishes it. How it works · what is in the database today.